5 Reasons For Lost Data Center Dollars

17 October, 2017

"Data center owners and operators are increasingly looking for ways to minimize total cost of ownership (TCO), cost per kW of IT load, and downtime...using an integrated and continuous modeling process can help data center administrators save millions of dollars annually per data hall."

Read the full article here and find out how simulation and modeling can help minimize costs.

Other Recent Posts


Release 14: Introducing the Unified Solver

The Unified Solver, one of our most important Release 14 additions, simplifies and expedites the so…

Read More


Release 14: Introducing 6SigmaDataNetwork

The Data Network Module shows current data network connectivity on both a physical and logical leve…

Read More